Guinea Waste-to-Energy Solutions:
Transforming waste into valuable resources through advanced pyrolysis technology for sustainable development in Guinea
Get Started
Comprehensive Waste-to-Energy Portfolio
Our integrated approach addresses Guinea's diverse waste management challenges through two specialized processing plants designed for maximum efficiency and environmental compliance. These proven technologies convert agricultural residues, municipal waste plastics, and industrial byproducts into valuable energy resources while meeting the highest international standards.
Catey Organic-Biomass Plant
Converts agricultural residues and organic waste into high-quality biochar, syngas, and bio-oils through controlled pyrolysis processing.
Catey Plastic-Oil Plant
Transforms waste plastics, tires, and rubber products into valuable pyrolysis oil, carbon black, and fuel gas through advanced thermal processing.
Catey Organic-Biomass Plant Specifications
The Catey Organic-Biomass Plant represents cutting-edge pyrolysis technology specifically engineered for Guinea's abundant agricultural waste streams. Processing 6-8 tons per day during standard 10-hour operations, this system maximizes resource recovery while minimizing environmental impact. The plant's modular design ensures reliable operation in tropical conditions with minimal maintenance requirements.
6-8
Tons Daily
Processing capacity
10
Hours
Daily operation
Our comprehensive feedstock flexibility allows operators to process diverse organic materials including wood chips from forestry operations, rice husks from processing mills, agricultural straw, coconut shells from copra production, and peanut shells from processing facilities. The system even accommodates pretreated sewage sludge, providing municipalities with a complete waste management solution.
Primary output consists of high-grade biochar suitable for soil amendment and carbon sequestration, while secondary products include clean-burning syngas for energy generation and wood vinegar for agricultural applications. This multi-product approach maximizes revenue potential while supporting Guinea's agricultural sector.
Biomass Plant Feedstock & Output Analysis
Primary Feedstock
Wood chips from sustainable forestry operations, rice husks from milling facilities, and agricultural straw provide consistent, high-energy organic matter for optimal biochar production and energy recovery.
Secondary Materials
Coconut shells and peanut shells offer excellent carbon content, while agricultural residues from Guinea's diverse farming operations ensure year-round feedstock availability.
Premium Output
High-quality biochar for soil enhancement, clean syngas for energy generation, and valuable wood vinegar for agricultural applications maximize revenue streams.
Catey Plastic-Oil Plant Specifications
The Catey Plastic-Oil Plant addresses Guinea's growing plastic waste challenge through advanced pyrolysis technology that converts 12-16 tons of waste materials daily into valuable petroleum products. This robust system processes diverse plastic types including PE, PP, PS, and PVC, along with waste tires and rubber products that traditionally burden municipal waste systems.
Processing Capabilities
Our plant handles whole tires, shredded tire blocks, rubber scraps, industrial gloves, and various rubber mats. With proper pretreatment, the system can also process oil sludge and certain industrial residues, providing comprehensive waste management solutions for Guinea's industrial sector.
The sophisticated thermal processing system operates under controlled atmospheric conditions to maximize oil recovery while minimizing emissions. Advanced temperature and pressure monitoring ensures optimal conversion rates and product quality consistency.
Pyrolysis Oil
High-quality fuel oil output
Carbon Black
Valuable industrial byproduct
Syngas
Self-sustaining reactor fuel
Plastic-Oil Plant Output & Revenue Streams
The Catey Plastic-Oil Plant delivers exceptional conversion efficiency with multiple revenue-generating outputs that create sustainable business models for Guinean operators. Our proven technology consistently achieves 40-50% pyrolysis oil yield by weight, producing high-quality fuel oil suitable for industrial heating, power generation, or further refining into diesel and gasoline fractions.
01
Waste Input
Mixed plastic waste, tires, and rubber materials enter the controlled pyrolysis chamber
02
Oil Production
Premium pyrolysis oil with heating value comparable to conventional fuel oil
03
Carbon Recovery
High-grade carbon black for rubber manufacturing and industrial applications
04
Energy Generation
Clean syngas powers the pyrolysis process, ensuring energy self-sufficiency
Carbon black output represents 30-35% of feedstock weight and commands premium prices in Guinea's growing rubber and plastics manufacturing sector. The self-generated syngas (10-15% by weight) provides process heat, eliminating external fuel requirements and reducing operating costs. Minimal residue and ash (5-10%) can be safely disposed or used in concrete applications.
40-50%
Pyrolysis Oil Yield
High-quality fuel oil production
30-35%
Carbon Black Output
Premium industrial material
10-15%
Syngas Generation
Self-sustaining energy source
5-10%
Minimal Residue
Environmentally safe disposal
Complete Installation & Support Package
Both Catey plants include comprehensive turnkey installation services designed specifically for Guinea's infrastructure and regulatory environment. Our complete package eliminates project complexity while ensuring rapid deployment and reliable operation from day one.
1
Comprehensive Turnkey Solution
From initial site preparation through final commissioning, our complete package addresses every aspect of plant deployment in Guinea's unique environment.
1
International Shipping
Complete freight management from manufacturing facility to Guinea installation site, including customs clearance and local transportation coordination
2
Professional Installation
Expert 60-day installation program with experienced technical teams ensuring proper commissioning and system integration
1
Engineering Support
Dedicated engineer provides 60 days of on-site technical supervision, system optimization, and operational training
2
Comprehensive Training
Complete operational training program covering safety protocols, maintenance procedures, and troubleshooting for local technical teams
Our included engineer travel, accommodation, and daily expenses ensure uninterrupted technical support throughout the critical installation and commissioning phases. Comprehensive testing validates all systems before handover, while extensive training programs prepare local operators for safe, efficient long-term operation.
Site Preparation & Infrastructure Requirements
Successful implementation requires comprehensive site preparation addressing Guinea's unique environmental and regulatory challenges. Our detailed site preparation protocol ensures optimal plant performance while meeting all municipal and environmental compliance requirements.
Site Preparation
Land clearing, debris removal, excavation, leveling, soil stabilization, drainage planning, and temporary access road construction for heavy equipment deployment
Foundation Works
Reinforced concrete foundations, anchor points, chemical-resistant flooring, loading platforms, and safety barrier installation around equipment areas
Utilities Installation
Electrical grid connection, power distribution, water supply, drainage systems, gas supply, and comprehensive safety lighting throughout the facility
Environmental Compliance
Our environmental compliance program addresses Guinea's regulatory framework through permit acquisition, emission monitoring equipment installation, comprehensive safety systems, controlled access implementation, and spill containment measures. Advanced monitoring systems ensure continuous compliance with air quality and noise regulations.
Regulatory Permits
Complete permit acquisition and regulatory compliance documentation for Guinea's environmental framework
Emission Monitoring
Advanced air quality and noise monitoring systems ensuring continuous environmental compliance
Safety Systems
Comprehensive safety protocols, controlled access, and spill containment measures
Professional Installation & Labor Coordination
Equipment installation requires precision coordination of specialized labor, heavy machinery, and technical systems integration. Our proven installation methodology combines international expertise with local workforce development, ensuring knowledge transfer and long-term operational success.
Our installation process leverages both international expertise and local workforce capabilities, creating a comprehensive approach that ensures successful project completion while building local technical capacity for ongoing operations and maintenance.
Heavy Equipment Installation
Crane and rigging services for reactor assembly, mechanical integration of both plants, comprehensive piping and ductwork for oil and gas handling, electrical wiring, and exhaust system installation
Skilled Local Labor
Professional foremen for quality control, certified electricians and plumbers for final connections, specialized technicians for system testing, and general labor for site management and cleanup
Storage & Operations
Designated feedstock storage areas, product storage systems for biochar and pyrolysis oil, chemical and lubricant storage racks, and covered areas for equipment protection
Quality Assurance
Comprehensive testing of all moving components, complete system integration validation, safety system verification, and operational readiness assessment before final handover
Investment Security & Project Success
Our comprehensive approach ensures project success through detailed contingency planning, robust quality assurance, and complete risk mitigation strategies. Every installation includes provisions for unforeseen challenges, equipment modifications, and additional safety measures that guarantee operational readiness.
60
Days
Complete installation
100%
Turnkey
Complete solution
Contingency planning addresses potential foundation modifications, equipment adaptations, and site-specific challenges that may arise during installation. Our extensive spare parts inventory, specialized tools, and consumables ensure uninterrupted progress throughout the installation phase.
Both plants represent proven technology with successful deployments across Latin America, delivering consistent performance in challenging tropical environments. Advanced materials and corrosion-resistant components ensure long-term durability and minimal maintenance requirements in Guinea's climate.
Complete safety gear and personal protective equipment (PPE) for all installation personnel demonstrates our commitment to worker safety and regulatory compliance. Our safety protocols exceed international standards while addressing Guinea's specific workplace safety requirements.

Project Success Guarantee: Our comprehensive turnkey approach, proven technology, and extensive support services ensure successful implementation and long-term operational success in Guinea's unique environment.